About Us

İltekno was founded in 1989 with the goal of bringing reliability and efficiency to the energy industry worldwide. 30 years of experience in EPC work, commissioning and after sales services has resulted in İltekno becoming a leading EPC contractor and system integrator. Through strategic partnerships with MWM, MAN, and Siemens, we have been delivering turnkey solutions tailored to customer needs worldwide.

Since its establishment, İltekno has successfully completed more than 320 projects across over 25 countries, including 150 turnkey EPC projects, achieving a total installed capacity exceeding 2,500 MW. Our expertise spans HFO power plants, cogeneration and trigeneration facilities, landfill gas and biogas power plants, wastewater treatment plant (WWTP) energy recovery systems, industrial automation, and solar power plants, enabling us to deliver reliable and efficient energy solutions across a wide range of industries.

Supported by strong in-house engineering capabilities, İltekno provides comprehensive EPC, commissioning, operation support, and after-sales services throughout the entire project lifecycle. Our experienced service teams deliver preventive and corrective maintenance, major overhauls, remote monitoring, and technical support to maximize plant reliability and operational performance.

Recognized by MWM as a Recognized Solutions Provider for the Middle East, Central Asia, and North Africa, İltekno combines engineering excellence, advanced technologies, and a customer-focused approach to deliver long-term value. Guided by quality, innovation, and sustainability, we continue to strengthen our global presence while contributing to the development of resilient and efficient energy infrastructure worldwide.

2026
İltekno Modular Power Plant Manufacturing Plant
2023

İltekno Modular Power Plant Manufacturing Plant

Established in 2023, the İltekno Modular Power Plant Manufacturing Plant is an integrated production center where the engineering design, mechanical and electrical assembly, integration, testing, and pre-commissioning factory acceptance processes for container and skid assemblies are carried out. The facility supports the production and on-time delivery of modular power plant equipment required for EPC projects in accordance with high-quality standards.

2021

Solar Energy Power Plant (SEP) Project Development and Installation

Iltekno, which began project development, consultancy, and installation of Solar Energy Power Plants (SEPPs), has quickly developed projects exceeding 350mW under 5.1.h, and installed over 45mW of turnkey rooftop and ground-mounted Solar Energy Power Plants (SEPPs).

Solar Energy Power Plant (SEP) Project Development and Installation
2,000 MW in 20 countries
2020

2,000 MW in 20 countries

The cogeneration, trigeneration and combined cycle power plant project completed by Iltekno in 250 different locations has reached 2,000 MW in total, and new countries in South America and Africa have been added to the reference list.

2019

350 Employees on its 30th Year

Iltekno has reached a total of 350 employees in 4 locations around the world in its 30th year.

350 Employees on its 30th Year
Siemens Solution Partnership in Automation Systems
2018

Siemens Solution Partnership in Automation Systems

An agreement was signed with Siemens.

2015

Branch Establishment in Africa

A total of 60 MW project in West Africa, Guinea was completed. The operation and maintenance of the power plants are carried out by Iltekno’s internal teams.

Branch Establishment in Africa
The installed capacity has reached 1,500 MW
2014

The installed capacity has reached 1,500 MW

Iltekno has concluded the projects of cogeneration, trigeneration and combined cycle power plant of 1500 MW in total. Iltekno started to develop projects in new countries such as Iraq, Algeria and Egypt.

2011

Establishment of Automation Facility

Iltekno has been offering its services since 2011 with its internal automation, internal software and panel manufacturing teams. An automation facility was opened in Gebze to offer Iltekno branded solutions.

Establishment of Automation Facility
The installed capacity has reached 1,000 MW
2010

The installed capacity has reached 1,000 MW

Iltekno has concluded the projects of cogeneration, trigeneration and combined cycle power plant of 1000 MW in total. All of these projects were carried out in Turkey and the Middle East.

2002

MWM Distributorship Agreement

In 2002, Iltekno established a partnership with MWM as the distributor of MWM cogeneration projects in Turkey. Many projects have been concluded since the first years of the agreement

MWM Distributorship Agreement
Establishment of Iltekno
1989

Establishment of Iltekno

Iltekno was established in 1989 in Istanbul. The first projects undertaken were gas turbines for many industrial facilities in Turkey. Cooperation was established with MAN as an “Energy Solution Partner”.

2.500 +
MegaWatt
Delivering high-efficiency power generation capacity across global industrial and utility-scale energy projects.
310 +
Projects
Completed engineering and power generation projects delivered with precision, reliability, and long-term performance.
250 +
Employees
A highly skilled international engineering team dedicated to excellence in energy systems and innovative solutions.
25 +
Countries
A global presence providing advanced energy engineering solutions across multiple regions and industries.
EXPERIENCE & PARTNERSHIPS
Proven Excellence Among The Globe
Proven engineering presence across 20+ countries.
Turkey Algeria Nigeria Iraq UK Georgia Cyprus Egypt Ukraine Serbia Mauritania Uzbekistan Guinea etc.
Discover More
itekno Global Presence itekno Global Presence itekno Global Presence
itekno Global Presence